Practice Overview

Justin Mort KC specialises in high value construction disputes with particular interest in and expertise in (1) energy, (2) infrastructure and (3) process engineering projects.

Justin is recommended for Construction in both Chambers Global and Legal 500.  He is also recommended in the Legal 500 for Middle East (construction) and for international arbitration.  Comments in the current editions of these directories include:

  • Dedicated 100% to the matter before him. He drills down the facts like no other QC.  His work ethic and focus is commendable.  He made himself available so can prepare on short notice and put in a stellar show at the hearing.” (Legal 500: Middle East, construction)
  • Justin is a persuasive advocate who tears through detail to get to the points that really matter. His advocacy is exceptional – clear, cogent and compelling.” (Legal 500: London Bar, construction)
  • Simplifies the complicated. Knows his stuff.  Great to work with.” (Legal 500: international arbitration)
  • He is regularly called upon in international disputes regarding energy projects.” (Chambers Global: construction)
  • His attention to detail is phenomenal and his cross-examination style formidable.” (Chambers Global: construction)

These comments, and similar ones appearing in the directories over the last 20+ years, are both accurate and apposite: Justin has an unparalleled reputation as a successful trial advocate, cross-examiner, strategist and lawyer.

Justin is a huge team player.  He is immediately responsive to client demands and questions at any time of day.  He ensures that the wider client team are fully engaged in his proposed trial strategy.  Uniquely he provides detailed notes of his proposed oral submissions and cross examination to the client well in advance of any hearing for comment, and in order to ensure that the client team can better follow and appreciate his method during any hearing.  His working habits (typically starting at 4am or 5am London time) correspond well with clients based in time zones located to the east of London such as in the Middle East or in China.

Justin’s innumerable reported cases arising from court proceedings, particularly in the TCC, and the original and ingenious legal arguments that he has deployed in fighting them, together constitute a formidable contribution to the law governing construction claims and arbitration.

Practice Areas
  • Infrastructure & Utilities
  • Energy & Natural Resources
  • Other engineering or geotechnical disputes
  • PFI/PPP
  • Injunctions
  • Applications arising under the Arbitration Act 1996
Infrastructure & Utilities

Justin has extensive experience of disputes, determined in arbitration, litigation or by other means, arising out of major infrastructure projects, including those with a significant IT element. Some recent examples, from both the UK and international arbitration, include:

  • Acting for a contractor in a series of disputes (in arbitration) subject to UAE law, including claims for variations and extension of time.
  • Acting for an Austrian contractor pursuing a claim for extension of time and loss and expense arising out of the installation and upgrading of a sophisticated traffic control and management system.
  • Acting for a consortium of contractors in relation to claims for payment arising out of the construction and upgrading of extensive waste treatment facilities.
  • Acting in a great number of cases for either the contractor or the statutory authority or other employer in connection with disputes arising out of the construction, upgrading, and/or maintenance and repair of roads / highways or road networks.
  • Acting for either the employer, contractor or specialist subcontractor in relation to disputes arising out of the construction, extension or upgrading of rail networks (above or below ground), and/or the design, manufacture and maintenance of rolling stock.
  • Acting for various contractors in relation to disputes arising out of infrastructure works required for the London 2012 Olympics and other associated construction projects.
  • Acting for various contractors engaged in the Crossrail project.
Energy & Natural Resources

Justin has experience of disputes arising under bespoke and standard forms of contract. Below are some examples; all of the disputes referred to below were for multi-million euros or the local currency equivalent:

  • Acting for a (French) EPC / main contractor in relation to disputes concerning termination, calculation of the final account, and claims for extension of time and further payment arising out of the construction of a gas power station (amended FIDIC red book).
  • Acting for the employer defending claims for extension of time and additional payment in relation to the design and construction of a biomass energy project (FIDIC yellow book).
  • Acting for a Spanish EPC contractor bringing claims for extension of time and associated loss and expense in relation to the construction of a gas turbine power plant (amended FIDIC form).
  • Acting for the (Danish) main contractor bringing a claim for extension of time and associated loss and expense arising out of the construction of an onshore wind farm.
  • Acting for the (US) main contractor bringing a claim in respect of unforeseen ground conditions arising out of the construction of a hydro-electric dam in the Far East (FIDIC red book).
  • Final account dispute arising out of the installation of an uninterruptible power supplies in a data centre by an Austrian contractor.
  • Acting for a (US) EPC contractor pursuing claims in respect of unforeseen ground conditions arising out of the construction of a gas power station in the Far East.
  • ICC arbitration arising out of the construction of a gas pipeline: resisting allegations of defective work and pursuing claims for variations and delay.
  • UNCITRAL rules arbitration arising out of the procurement and construction of a sunflower oil facility in Ukraine.
  • LCIA arbitration concerning the refurbishment of an oil platform in the Middle East: defending the contractor’s delay claim on behalf of the employer.
  • Acting for the EPC / main contractor bringing a claim for extension of time in relation to the construction of a CHP waste to energy plant.
  • Acting for the employer defending a delay claim arising out of a copper mining project in Zambia (adjudication and LCIA arbitration, as well as in the Commercial Court).
Other engineering or geotechnical disputes
  • Claims by contractor for (a) unforeseen physical conditions and (b) force majeure, arising out of the construction of a landfill site in St Lucia under a FIDIC form.
  • Acting for the main contractor bringing claims for payment, and resisting allegations of defective work, in relation to the construction of a high tech paint manufacturing facility.
  • Acting for the US and German partners in a joint venture dispute arising out of the construction of a facility for the processing of hydro-carbon by-products.
  • Acting for a developer in relation to the defective construction of a factory outlet shopping centre due to physical conditions.
  • Acting for a Japanese contractor in relation to claims for additional payment and delay arising out of the construction of an EVOH process plant.
PFI/PPP
  • Final account dispute arising out of M&E works undertaken at a psychiatric hospital built for North Tyneside and Northumberland Mental Health NHS Trust: trial in the TCC.
  • Acting for PFI concessionaire as defendant in TCC claim for additional payment brought by building contractor and as claimant in corresponding pass-through claim against South Tees Acute Hospitals NHS trust.
  • Acting for a main contractor in a delay claim against Central Manchester and Manchester Children’s University Hospitals NHS Trust.
  • Acting for a groundwork subcontractor in claim arising out of the construction of a community college.
  • Acting for the operator of a local authority leisure facility and teaching pool against the maintenance contractor in a series of adjudications.
Injunctions

Recent experience of injunctive work includes the following:

  • Acting for a contractor, resisting an application for a final injunction to prevent it from bringing a second adjudication, in circumstances where it had abandoned an earlier adjudication in relation to the same or overlapping subject matter (Jacobs UK Ltd v Skanska Construction Ltd).
  • Acting for a designer, resisting an application for an interim mandatory injunction requiring the designer to restore its client’s access to the building information model (BIM) maintained by the designer.
  • Obtaining a freezing order on behalf of a design and build contractor against an employer registered in the BVI, following a determination in adjudication that the employer had repudiated the building contract (Primus v Cannon).
  • Acting for a contractor, resisting (1) an application by the employer in the TCC for a mandatory injunction for delivery up of project documents following, the determination of the employer’s entitlement to the documents in adjudication (2015), and (2) subsequent court proceedings (2017) in relation to the same or similar subject matter (Imperial Chemical Industries Ltd v Merit Merrell Technology Ltd).
  • Acting for an employer, resisting an application for an injunction to prevent the employer from making a call on an on demand bond, in the context of an amended FIDIC contract (J Murphy & Sons Ltd v Beckton Energy Ltd).
  • Resisting an ant-suit injunction in the commercial court to prevent enforcement of interim injunctive relief obtained in support of arbitration (U&M Mining Zambia Ltd v Konkola Coper Mines plc).
  • Obtaining an interim injunction on behalf of a contractor to prevent the employer from making a call on an on-demand bond (RG Spiller Ltd v Derhalli).
  • Acting for a contractor seeking an injunction in the TCC to prevent the contractor’s solicitors from acting against it in adjudication proceedings.
  • Acting for the claimant in a claim in the TCC for interlocutory and final mandatory injunctions (alternatively: order for delivery up), requiring the return of takeover packages unlawfully removed to Italy (Alstom Power Ltd v SOMI Impianti SRL).
  • Application for injunction and strike out of a winding-up petition in the companies’ court; subsequent application for indemnity costs.
  • Resisting an application in the TCC for an injunction requiring the main contractor on a sensitive building project to permit the employer’s remedial works contractor to attend site.
Applications arising under the Arbitration Act 1996
  • Dispute as to a party’s entitlement to seek interim injunctive relief in the court local to the project in circumstances where the seat of the arbitration was London under the LCIA rules (commercial court): sections 2(3) and 44 of the Arbitration Act 1996 and article 23.5 of the LCIA rules considered.
  • Application to set aside an arbitral award under section 68 of the Arbitration Act (serious irregularity) together with application for permission and appeal under section 69 on a question of law: construction of sections 57 and 70.
  • Resisting a section 9 application to stay TCC proceedings for arbitration in Denmark arising out of a BVI company’s building project in the UK.
  • Resisting an application to stay a counterclaim for arbitration made by the claimant at the same time as its own application for summary judgment under the same contract.
  • Application to stay a counterclaim for arbitration in circumstances where the claim arose from a contract that provided for the resolution of disputes in litigation whereas the counterclaim arose out of a contract containing an arbitration agreement.
  • Appeal in the TCC from an arbitrator’s refusal to grant security for costs in a final account arbitration arising out of the construction of a residential development.
Case Reports
Case Date
Panther Real Estate Development LLC v Modern Executive Systems Contracting LLC 12 May 2023
Northumbrian Water Ltd v Doosan Enpure & Anor [2022] 14 November 2022
Buckingham Group Contracting Limited v Peel L&P Investments and Property Limited 15 July 2022
Langage Energy Park Ltd v EP Langage Ltd 4 March 2022
Buckinghamshire Council v FCC Buckinghamshire Ltd 26 October 2021
Downs Road Development LLP v Laxmanbhai Construction (UK) Ltd 11 August 2021
Premier Engineering v MW 18 September 2020
VVB v Optilan 7 January 2020
Swansea Stadium Management Company v Swansea and Interserve [2019] EWHC 989 (TCC) 17 April 2019
Swansea Stadium Management Company v Swansea and Interserve [2018] EWHC 2192 (TCC) 15 August 2018
Swansea Stadium Management Company v Swansea and Interserve [2018] EWHC 2210 (TCC) 24 July 2018
Adam Architecture Ltd v Halsbury Homes Ltd 2 November 2017
Jacobs UK Ltd v Skanska Construction Ltd 29 September 2017
Kersfield Developments (Bridge Road) Ltd v Bray and Slaughter Ltd 18 January 2017
Trant Engineering Ltd v Mott McDonald Ltd 5 July 2017
Imperial Chemical Industries Ltd v Merit Merrell Technology Ltd (costs) 26 July 2017
Imperial Chemical Industries Ltd v Merit Merrell Technology (liability) 12 July 2017
Lea Valley Developments Ltd v Derbyshire, decision of Adrian Williamson QC (substantive issues) 16 June 2017
Lea Valley Developments Ltd v Derbyshire, decision of O’Farrell J (jurisdiction) 19 April 2017
North Midland Construction plc v Geo Networks Ltd 30 October 2015
William Clark Partnership v Dock St PCT Ltd: 16 October 2015
J Murphy & Sons Ltd v Beckton Energy Ltd 2016
Commercial Management (Investments) Ltd v (1) Mitchell Design & Construct Ltd (2) Regorco Ltd (Formerly Roger Bullivant Ltd) 2016
Imperial Chemical Industries Ltd v Merit Merrell Technology Ltd 2015
Hurley Palmer Flatt Ltd v Barclays Bank plc 2015
Transformers & Rectifiers Ltd v Needs Ltd (decision of Coulson J) 2015
Transformers & Rectifiers Ltd v Needs Ltd (decision of Edwards-Stuart J) 2015
Atkins Ltd v Secretary of State for Transport 2013
Parkwood Leisure Ltd v Laing O’Rourke Wales and West Ltd 2013
U&M Mining Zambia Ltd v Konkola Copper Mines plc 2013
Fileturn Ltd v The Belgrave London Ltd 2013
Alstom Power Ltd v Somi Impianti S.r.l (2012) 2012
Alstom Power Ltd v Somi Impianti S.r.l (2011) 2011
Rust Consulting Ltd v PB Ltd (decision of Edwards-Stuart J) 2011
Alstom Power Limited v Somi Impianti S.r.l (2011) 2011
Rust Consulting Ltd v PB Ltd (decision of Akenhead J) 2010
GPS Marine Contractors v Ringway Infrastructure Services 2010
Beck Interiors Ltd v Dr Russo 2010
Heifer International Inc v Helge Christiansen Arkitekter KS MAA PAR 2008
Construction Partnership UK Ltd v Leek Developments Ltd 2006
Captiva Estates Ltd v Rybarn Ltd 2006
Brian Warwickshire Partnership v HOK 2006
Bella Casa Ltd v Vinestone Ltd (2006) 2006
Multiplex Constructions (UK) Ltd v West India Quay Development Company (Eastern) Ltd 2006
Plymouth and South West Co-operative Society Ltd v Architecture Structure and Management Ltd 2006
Tracy Bennett v FMK Construction Ltd 2005
Bella Casa Ltd v Vinestone Ltd (2005) 2005
Rossco Civil Engineering Limited v Dwr Cymru Cyfyngedic 2004
Orange EBS Ltd v ABB Ltd (2004) 2004
Simons Construction Ltd v Aardvark Developments Ltd 2003
Orange EBS Ltd v ABB Ltd (2003) 2003
Galliford Try Construction Ltd v Michael Heal Associates Ltd 2003
RC Residuals Ltd v Linton Fuel Oils Ltd 2002
David McLean Housing Ltd v Swansea Housing Association Ltd 2002